torsdag den 8. januar 2009

The assignment I am currently doing is a walkcycle. The timing is as I want it now and not too many things need a bit of tweeking before I can move along and do the arms and head.A fix on a small spacing issue with his right leg towards the passing pose, a clarification of the arc of his right foot as it pushes off and some care to the left heel on the up pose, this combined should make me happy! The walk should be done end of this week.

Long days ahead with this one!

Here is a link to a version in a higher resolution : http://www.vimeo.com/2759414

Ingen kommentarer: